External work to tower, including repairing the crack which runs from the parapet to the ground on the west side, stabilising the fragile pinnacles and parapet, and fixing the roof £62,500
Internal work, including repairing the tower stair treads and handrail, installing a disabled lavatory in the present vestry and moving the vestry to the north chapel, and increasing the electricity supply to allow an effective heating system £45,000
Restoration of our three bells and bell chamber, so that they can be safely rung now, and increased in number if desired at some time in the future £32,000